Connection Fees

 

Section 5.2 – Connection Fees

a. Single Dwelling or Single Non-Residential Business Connection (for lots located within compliant subdivisions where capacity has been reserved or for properties not located within a subdivision)

Meter Installation – Straight Set (no line extension, no road crossing)

Meter Type and Size Meter Setting Fee + System Development Fee = Tap Fee + Membership Fee + CSI Fee = Total Fee
5/8″ simple $470.00 $7,300.00 $7,770.00 $100.00 $100.00 $7,970.00
3/4″ simple $490.00 $12,100.00 $12,590.00 $100.00 $100.00 $12,790.00
1″ simple $730.00 $17,000.00 $17,730.00 $100.00 $100.00 $17,930.00

Section 5.2.2 – Subdivisions or Non-Compliant Subdivisions Requiring Capacity Reservation

Meter Installation – Straight Set (no line extension, no road crossing)

Meter Type and Size Meter Setting Fee + System Development Fee1 = Tap Fee + Membership Fee + CSI Fee = Total Fee
5/8″ simple $470.00 $7,900.00 $8,370.00 $100.00 $100.00 $8,570.00
3/4″ simple $490.00 $12,700.00 $13,190.00 $100.00 $100.00 $13,390.00
1″ simple $730.00 $17,600.00 $18,330.00 $100.00 $100.00 $18,530.00

1$600 of the System Development Fee is for the capacity reservation fee.

Multiple Connection Service, 1″ Meter or Smaller – Straight Set (no line extension, no road crossing)

For meter sizes 1″ and smaller, the tap fee for a multiple dwelling connection such as an apartment, multiunit residential structure, or manufactured housing park shall include the meter setting fee for the meter size specified by Aqua plus a System Development Fee equal to the System Development Fee for a 5/8″ meter times the number of dwelling units or manufactured home pad sites to be connected to the meter.

Multiple Connection Service is available only for apartments, manufactured housing parks, and multiunit residential structures such as duplexes. All other residential service must comply with the one dwelling per meter policy stated in Section 3.07 of this Tariff. Whenever an increase is proposed in the number of dwelling units, or in the case of a nontransient manufactured housing park, an increase in the number of pad sites, the member shall pay to Aqua the appropriate System Development Fee before making such expansion. Whenever Aqua determines that the number of dwelling units or pad sites connected to a master meter exceeds the number of units that have been paid for by the member, the member shall pay a System Development Fee equal to the System Development Fee for a 5/8″ meter times the number of additional dwelling units or pad sites that are connected to the meter. The System Development fee for the additional dwelling units or pad sites shall be paid within 30 days of the date that Aqua provides notice to the member.